Built at a cost of Rs. 437.8 bn, the 272-km railway project passes through eight districts and includes 36 tunnels spanning 119 km and 943 bridges. Supporting roads covering more than 215 km have been built, the corridor has been electrified, and the project has generated over 50 mn person-days of employment.